There is a lot of equipment moving these days as we pack up for the
coming winter. We had to rearrange the drill heads to be stored in
the IceCube Lab, so we called up the help of a forklift. To access
the first floor of the raised lab, a snow ramp was built at the
beginning of the season. A pretty impressive operation. Here are some more photos.
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment